"2"^^ . "1"^^ . . . "1"^^ . "Yikes!!!! STAY AWAY FROM THIS CONTRACTOR. \n\nWe contracted with them to do a very simple job of installing trim on our kitchen cabinets. However, when they were done they left a very large and unsightly gap at the top of the trim that was installed. I was told this was due to the unevenness of the counter tops. Normally, irregularities would be discovered and addressed when the field measurements are taken. But apparently there were some miscalculations, so we ended up with the gap. I offered to compromise and provide some additional trim to cover this gap in lieu of tearing out the newly installed trim and starting over. Unfortunately, when I brought this proposal to New Prairie Construction's attention, I was told it would cost me over $200.00 to repair their mistake. I'm unsure how this became my fault, but I'm very disappointed.\n\nIn addition to the workmanship, we agreed to a not to exceed, time and materials contract. However when I got the bill, it was hundreds of dollars in excess of their original not to exceed limit. They eventually adjusted the bill, but it took several e-mails and discussions for then to own up to their mistake."^^ . . "0"^^ . "2014-01-15T00:00:00"^^ .