Went r.c. willey. beanos installed. nothing but a hot mess. had to have the supervisor come out and inspect the job. uneven floor cuts. messed up banister with tool removing tile. chipped tile in adjoining room etc. the thing that bothered me and was weird was that one of the workers left his toothbrush and toothpaste in my downstairs bathroom. also they felt free to charge their phones on my dime. tomorrow the r.s willey and beanos supervisor coming to inspect the job. crazy!!