My wife and I hired Mike to remodel our kitchen. HUGE mistake. He quoted us 6 weeks to complete the work and told us anything we wanted to hear during the design phase to get us to sign with him and give him the large down payment. Fast forward to 16 weeks later and the job still wasn't complete. Not only that, but some of the work that was done was done incorrectly and not matching or not working correctly. They refused to fix the work and complete other areas of the work and so I was left with an incomplete job that took almost 3 times as long as it should have.