Fast, quality, and courteous work. I had a disastrous pool in a rental property. It was the original plaster from 1987-1988 and it was chipping in lots of places with concrete showing in two big patches. I called Barefoot and they came out and did an in-home measurement along with showing me pebble samples. They gave me several options along with written quotes for each option. The quotes were detailed and broken down to show all of the minutae of the work to be performed. I went with the blue frost pebble look and they gave me a start date of 02/20. They started on time and within 3 days, the pool had been drained, the old plaster completely chipped out, and the new edge tile had been installed. A few days later, the new pebble plaster(?) was installed and acid washed. Total time start to finish? Roughly 16 days and the pool looks incredible! Now I need to do the pool decking!