This year we decided to get the pool remodeled since the plaster was starting to crumble in a few places. I called a handful of places (some big names, some smaller) and decided to go with Matt for a number of reasons. Nobody was better than Matt in terms of laying out all of my options and making recommendations based on the budget I had. I appreciated that he took the time to explain every cost involved with a remodel and what options I had for some of the items. He really showed his knowledge when he gave me a timeline and then gave me the reasons why things may be delayed a bit (e.g. concrete work needed). The project came to an end only a few days later than initially estimated. During the project, I reached out to him with a status update and he got back to me within a day with an updated timeline, it was really helpful. It's been a few months since the project has been wrapped up and everything still looks fantastic. Thanks Matt!
Work done: Pebbletec pool, new tile, cool decking, water leveler installed, filter-related additions.